I ran two, but look much less stylish. It was hot and gross from hurricane leftovers that day, but we survived anyways.
The story of an old house, which happens to be our first house.
It looks pretty cool at night too!
Here you can see the decking down and working on the railing. I used the Tiger-Claw hidden fasteners to put the decking down, and the surface came out nice and smooth. Unfortunately, it took a long time and a ton of effort to put down. Luckily, the hot tub was fully operational then, so I took full advantage of it. Here's some pictures of the railing.
The posts are 2x4's mounted on end to the rim joists with carriage bolts. I painted the 2x4's to make them stand out a bit and then made the rest of the railing out of cedar. There are three horizontal rails, at the top and and bottom are 3" rails and then a smaller 1 1/2" rail at the very bottom. The ballisters are 1x3" cedar glued and screwed to the rails. You can see on the left of the picture the alternate style of ballisters I used. On the corners and under the privacy screens on the end of the deck I alternated the 1x3" with 1x6 boards laid flat on the rails. All in all, it came out great. I spent pretty much the whole 4th of July weekend doing it, but we're really happy with how it looks. It's pretty much the coolest railing in town. The curved railing over the pond was a challenge.
Despite having to rebuild the porch this fall (I know), I foolishly started on another bedroom upstairs. I took advantage of Julies Dad being around to get started in there. He helped pull off all the trim, pull up the flooring, and cut the bottom of the wallboard off. I'm going to put up composite paneling (similar to flat paneling), it's basically a way to make pseudo-raised paneling that allows you to use dimensionally stable veneered plywood for most of the parts. Vastly less manufacturing and no worries about wood movement. We'll see. I had to rewire most of the room once I got a look at the wiring, which let me get ready to mount the boxes horizontally, where I can put them in the baseboard, so they won't interfere with the panel placement. You can also see the cool wallpaper I put up in there this week. It's textured and fabulous!
Julie also made a seat cushion and curtains for the window seat in the purple room. They came out amazingly, even if the huge piping on the seat cushion about broke her sewing machine.
Before: Ugly wallpaper.




Next, I ripped some colonial base down to 3", returned it on both ends for the top cap (I didn't want to use crown moulding at the top to make a dust collector). Then I used a piece of be moulding on the top against the colonial cap to make it look like nice.




Lastly, here's a cool secretary we found at an antique store near here. Julies grandmother appears to have the highboy version of the exact same piece of furniture which is pretty neat. The makers mark is missing from ours, so we'll never know for sure, but it's a dead ringer for some pictures of secretary's made by a place called Maddox Furniture. They were located in western NY (Jamestown), so that gits as well, it's nothing special of course, but neat nonetheless.
So long!
I taped up the seams of the rosin paper, primarily to make sure that it would be easy to keep the floor clean as I worked. The plan was to put a cherry border around the room 3 strips (9") wide around the room in a picture frame setup (woven corners) and doing he bulk of the floor with the birch. I started off the next day putting the first piece of cherry along the side of the room I was working from and started around the sides of the room. After a trip to the rental store, I brought back the flooring nailer. I was able to use the nailer on the second piece of flooring, which was far better than hand nailing things. I picked up the nailer around 9am and worked straight for about 12 or 13 hours. You get loopy after 8 or so hours of racking, cutting and nailing flooring.
Here I am just about finishing up. You'll notice it's plenty dark outside. I worked alone until about 2 in the afternoon, and then Julie bailed me out and started racking and cutting boards for me. The picture framed cherry I had oriented so that the tongues were facing the birch, but the flooring we got wasn't end-matched (no groove on the ends). So Julie took over the job of racking the pieces and adding the groove to pieces that abutted the cherry border. I had setup the tenoning jig on the tablesaw to cut the groove, and she ran the table saw all afternoon.
I wouldn't have finished in one day without her helping me with it. It was a ridiculously long day, but I was glad to just get it done. The next morning, I drove back to the rental store, returned the nailer and promptly picked up the floor sander. I was laughed at.
The floor sanded out really nice. I used one of the jitterbug type sanders instead of a drum sander. I think next time I will go for the drum sander. I know it's harder to control and much more aggressive, but the jitterbug takes for ever and all of your money goes into sand paper. The sheets of sandpaper are about 8x for the jitterbug, and so being a cheapskate, I end up using fewer pieces of sandpaper then I should. Either way, I did a fine job of producing massive amounts of dust and the floor sanded up nicely. We swept, vacuumed, swept some more, vacuumed a couple more times, and finally dust mopped with denatured alcohol on rags.
Once this dried, we followed up with a coat of sanding sealer (zinser sealcoat), and then the poly. I wanted to try to match the character of the original hardwood flooring downstairs, and I wanted to make sure the cherry darkened up nicely, so I used oil-based Varathane. I had a really tough time with the mop head applicator for the urethane and quickly abandoned it. I ended up on my hands and knees applying three coats of poly with a 4 inch brush. Thank goodness it was only 160 sqft!
Above is the floor with one coat of poly and below is with three coats on. The first coat was a little crappy, but I got better as went along and the third coat was pretty good. Hopefully it'll hold up well and I won't be repeating the process in 2 years.
Next, I'll show you the trim and the frieze boards I made for over the doors.
All the power in this room is on a new circuit, so the other bedrooms are less stressed as well. Of course, I also managed to run cable and cat5 up to this room, because I can't help myself.
We painted the room kind of a sky-blue color. We're planning on doing white trim in here, so we wanted a rich color to set off the white trim. We want to do paneled walls with a plate rail in here, so lots of white against the blue. The walls actually came out quite good, which is probably a minor miracle and only took 3 mud/sand cycles. I was prepared for more, but we did a pretty good job, I think.
We found a hardwood supplier in the next county over that harvests and mills locally (Schuyler county), which was pretty cool. It took two trips by me and one trip by Julie, but we finally decided on birch with a cherry border. We had intially thought Oak, then I wanted cherry with a maple border, on and on. Finally, Julie really liked the look of Birch, and so we went with that. We used 3 1/4 strips, but I think I actually like the 2 1/4 better. The mill has also recently started making quarter-sawn oak and they're doing up to 10" wide stuff. If only I could get my hands on some unfinished walnut 2 1/4 flooring I'd be a happy man! Either way, I managed to just barely jam 160 square feet of birch and cherry hardwood flooring in the Audi, and I figured you'd appreciate the picture. Around every corner, the pile of wood tried to squish me, but I made it home! Snow and all!